Panel discussion: Elevating passenger experience through prefabrication
10 Apr 2025
N103
Airport design, planning and development
SFO’s US$2.6bn Terminal 3 Project seeks to renovate and expand the existing terminal while maintaining live airline operations of 37 gates. The project constructed two temporary elevated passenger corridors to route passengers around the construction site to optimize passenger experience and safety, construction efficiencies and phasing reductions, cost and schedule savings and sustainability. 11 prefabricated modules, each with complex finishes and MEPF/SS systems, were transported across the airfield at night and set into place with a ¾ tolerance. Extensive preplanning and coordination were critical to the success and enabled project delivery one year earlier.
How to operationally maintain a high level of passenger experience during phased construction of a megaproject and existing facility
The benefits of faster installation through off-site prefabrication, leading to quicker project completion
The positive impacts on gate operations, including longer availability of active gates and earlier start of terminal construction
The enhanced safety measures resulting from reduced on-site construction activity, lowering safety risks to the active terminal
The cost savings achieved through prefabrication, which allows for landside construction and easier working access
Become a Sponsor and unlock unique commercial opportunities. With a diverse audience of industry professionals, thought leaders, and innovators, this is the perfect platform to position your brand and gain unparalleled visibility, credibility, and access to a targeted network of decision-makers. We offer a variety of sponsorship packages to suit your needs, from exclusive title sponsorships to customisable options. Each package is designed to maximise your exposure and impact before, during, and after the event.